In English Attach the Charging valve at Discharge Line and check the pressure of the compressor.(Compressor pressure should be 500-PSI.) Apply charging Valve to the capillary tube. Apply one line of high pressure gauge to the compressor. The other line apply to the capillary tube.(Circuit section line should be open and run the compressor.) The